Enlarge image
Image 1 of 6
High-Performance Epoxy Intermediate Paint with Glass Flake
Two-component epoxy intermediate coat for steel substrates.
Reference price (FOB)
US $3.8-4.5 / kg
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Intermediate Paint
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:200um Dry Film: 120um
- After Sales Service
- 5 Years
- Component
- Two-Component
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Singal
- Origin
- China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Number of components
- Two-component
- Color
- Grey
- Gloss
- Matt
- Theoretical Coverage Rate
- 290 g/m², 5 m²/L (calculated at 100 μm dry film thickness, excluding wastage)
- Proportion
- About 1.20
- Dry Time
- 23±2°C Surface dry time ≤2h, Through dry time ≤24h
- Fully cured
- 7 days
- Flash Point
- 23 ºC
- Shelf life
- 12 months
- Mixing Ratio
- Component A (Base Paint) : Component B (Curing Agent) = 4:1
- Maturation Time
- 23 ± 2°C:0.5-1h
- Pot Life
- 23 ± 2°C: 5h
- Application Methods
- Airless spraying, conventional air spraying, brushing, rolling
- Thinner
- X-300 Thinner
- Tool Cleaning
- X-300 Thinner
- Film Thickness
- Wet film: 200 μm Dry film: 120 μm
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
FZ-H002 High-Performance Epoxy Intermediate Paint with Glass Flake
Product Description:
It is applicable to the surfaces of ports, railway bridges, petrochemical facilities, steel structures, and overhead pipelines, protecting them from erosion by corrosive media such as atmosphere, seawater, acids, alkalis, oils, salts, and chemical gases.
Physical Parameter
| Number of components | Two-component |
| Color | Grey |
| Gloss | Matt |
| Theoretical Coverage Rate | 290 g/m², 5 m²/L (calculated at 100 μm dry film thickness, excluding wastage) |
| Proportion | About 1.20 |
| Dry Time | 23±2°C Surface dry time ≤2h, Through dry time ≤24h |
| Fully cured | 7 days |
| Flash Point | 23 ºC |
| Shelf life | 12 months |
Construction Instruction
| Mixing Ratio | Component A (Base Paint) : Component B (Curing Agent) = 4:1 |
| Maturation Time | 23 ± 2°C:0.5-1h |
| Pot Life | 23 ± 2°C: 5h |
| Application Methods | Airless spraying, conventional air spraying, brushing, rolling |
| Thinner | X-300 Thinner |
| Tool Cleaning | X-300 Thinner |
| Film Thickness | Wet film: 200 μm Dry film: 120 μm |
| Airless Spraying | Conventional Air Spraying | Manual Rolling and Brushing | |
| Maximum Thinner Addition | 10% | 20% | 10% |
| Nozzle Orifice | 0.4-0.5mm | 2.0-3.0mm | |
| Discharge Pressure | 15-30MPa | 0.3-0.5Mpa |
Recoating Interval
| Ambient Temperature | 5ºC | 20ºC | 30ºC |
| Min | 24h | 16h | 8h |
| Max | 3 months | ||
Surface treatment:
When applying paint onto the surface of the primer, a secondary rust removal process is required to achieve Grade St3 cleanliness. If the primer has been exposed to the atmosphere for an extended period, all contaminants such as white rust, oil stains, etc., must be removed, and any chalked paint surface should be sanded off.
Compatible Coatings
Primer: Epoxy zinc-rich primer or other epoxy primers;
Topcoat: Products such as acrylic, polyurethane, and fluorocarbon coatings.
Construction conditions:
Substrate temperature must exceed the dew point by at least 3°C, with relative humidity <85% and wind speed ≤ Level 3.Outdoor applications shall avoid rainy, foggy, or dusty conditions, as well as morning/evening dew formation.Under normal circumstances, the coated surface should not be exposed to rain within 16 hours after application.
Notes:
1.Due to the high content of powder materials in the coating, it is recommended to use mechanical stirring to thoroughly mix Component A evenly before blending it with Component B and stirring the mixture uniformly.
2.During the application process, stir the coating frequently to prevent sedimentation, which could lead to an imbalance in the ratio of powder to liquid materials and compromise the quality of the paint film.
3.The mixed two-component coating should generally be used up within 5 hours, as exceeding this time limit may affect the coating quality.
4.After use, the curing agent container must be tightly sealed and used up as soon as possible to prevent reactions with moisture in the air, which could result in losses.
Storage:
1.The product must be stored in tightly sealed containers in a well-ventilated, dry area away from direct sunlight. The recommended storage temperature range is 0-35°C.
2.The product shelf life is 12 months from the date of manufacture. Beyond this period, the product may be retested according to specifications. If compliant, it may continue to be used.
Safety:
1.Use only in well-ventilated areas. Avoid inhalation of mists or vapors. Prevent contact with skin and eyes. In case of eye contact, rinse thoroughly with plenty of water and seek immediate medical attention.
2.When applying in confined or poorly ventilated spaces, mandatory forced ventilation and full protective equipment (respirator, gloves, goggles) must be used.
Discuss this product for your project
Include your application, required quantity and destination.
