Enlarge image
Image 1 of 6
Model: ST-Z801
ST-Z801 Natural Colored Sand True Stone Building Coating for Durable Wall Protection
ST-Z801 acrylic texture coating for wall substrates. Supplied in liquid form.
Reference price (FOB)
US $0.7-1 / kg
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- ST-Z801
- Color
- Customize
- Appearance
- Liquid
- Main Raw Material
- High-Quality Acrylic Emulsion,Natural Mineral Sand
- Method
- Spray
- Level
- Finish Coat
- Drying Method
- Air Drying
- Substrate
- Wall
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Surface Drying Time
- ≤4h(25°c, Rh≤85%)
- Recoat Interval
- ≥8h(25°c, Rh≤85%)
- Construction Conditions
- 5-40℃
- Dry Film Thickness
- 2-3mm
- Theoretical Coating Rate
- 3-5kg/M²
- Construction Tools
- Stainless Steel Batch Knives, Spray Guns, etc
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 20kg/Barrel
- Origin
- China
- HS Code
- 3209909090
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Main Components
- High-quality acrylic emulsion, natural mineral sand, all kinds of a dditives
- Theoretical coating rate
- 3-5kg/m² (2 times, the actual coating rate of the product will vary depending on different factors)
- Surface drying time
- ≤4h(25°C, RH≤85%)
- Recoat interval
- ≥8h (25°C, RH ≤85%)
- Dry film thickness
- 2-3mm
- Grassroots treatment
- Before construction, remove the dirt, dust, loose materials, etc. on the base of the old wall, and carry out construction after the base is dried.
- Lattice seams
- According to the construction requirements, the wall is divided into grids, and the grid joints are calibrated according to the design requirements, and the masking paper is used for protection construction.
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 20kg/Barrel
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Premium Natural Colored Sand Ture Stone Building Coating for Durable Wall Protection
Using natural crushed stones as aggregate, high-quality acrylic emulsion as the base material, and various additives, it is formulated to resemble marble and granite in decorative effect. The buildings decorated with stone paint have the natural and real color of nature, giving people an elegant, harmonious and solemn aesthetic feeling.
Quality management system
Specifications
Applications:
Suitable for new construction and renovation projects of various indoor and outdoor buildings, such as residential houses, office buildings, hotels, factories, schools, etc.
Performance characteristics:
1. Fireproof, waterproof, resistant to acid, alkali and pollution;
2. Non-toxic, odorless, with strong adhesion and never fading;
3. Effectively prevents the erosion of harsh external environments on buildings, extending their service life;
4. Stone paint has good adhesion and freeze-thaw resistance, making it particularly suitable for use in cold regions;
5. Simple construction, quick-drying and time-saving.

Performancfe Parameters
| Main Components | High-quality acrylic emulsion, natural mineral sand, all kinds of a dditives |
| Color | Customize |
| Theoretical coating rate | 3-5kg/m² (2 times, the actual coating rate of the product will vary depending on different factors) |
| Surface drying time | ≤4h(25°C, RH≤85%) |
| Recoat interval | ≥8h (25°C, RH ≤85%) |
| Dry film thickness | 2-3mm |
1. Primer: Singal alkali-resistant sealing primer.
2. Topcoat: Singal natural colored sand stone paint.
3. Finishing coat: Singal special stone paint finishing varnish.
Partial color(For specific color details, you may consult the sales manager.)
Construction methods and steps
| Process steps | Number of times of construction | Consumption (kg/m²) | Recoating time (20 °C) h | Construction tools | Remark |
| Grassroots treatment | Before construction, remove the dirt, dust, loose materials, etc. on the base of the old wall, and carry out construction after the base is dried. | ||||
| Leveling putty | 2-3 | 1.0-2.0 | 8-12 | Batch knives, shovel blades, rulers, etc | The flatness of the base layer reaches 1mm -2mm |
| Sealing primer | 1-2 | 0.1-0.15 | 4-8 | Rollers, wool brushes, or spray guns | Alkali resistant mounting |
| Lattice seams | According to the construction requirements, the wall is divided into grids, and the grid joints are calibrated according to the design requirements, and the masking paper is used for protection construction. | ||||
| Main material | 1-2 | 3.0-5.0 | 8-12 | Spray guns, batch knives, etc | |
| Brush cover varnish | 1 | 0.1-0.15 | 4-8 | Rollers, wool brushes, or spray guns | Protective effect, improve aging resistance ability |
Construction Guidance:
1. Construction tools: stainless steel batch knife, special spray gun.
2. Dilution method: Dilute according to the instructions for use of the product.
3. Tool cleaning: Wash with water immediately after construction.
4. Construction conditions: the temperature of the wall is between 5-40°C, the moisture content is ≤10%, and the air humidity is ≤85%.
Construction Instructions
1. Substrate Treatment
Before treating the substrate, ensure the wall has been cured for a certain period. Use coarse putty (plastering mortar) to treat the substrate. Before troweling, remove loose, peeling, hollow, powdery substrates, as well as dirt, oil, and other contaminants.
2. Construction Specifications
2.1 Before spraying the stone paint, it is mandatory to apply an alkali-resistant sealing primer to enhance the alkali resistance of the substrate and improve the bonding force between the substrate and the surface layer. Stir the stone paint thoroughly before construction. During spraying, ensure consistent product viscosity, uniform air pressure, the same size of the spray gun nozzle, and consistent spraying distance.
2.2 Stone paint construction is challenging. If not controlled properly, the coating is prone to local mottling. Therefore, during construction, pay attention that the spray gun should not start or stop on the wall surface being worked on; the movement speed of the spray gun should be uniform; the edge of each spraying range should overlap 1/3 of the previously sprayed range, and the overlap width should be consistent to maintain uniform coating thickness.
2.3 After the main coating construction is completed and completely dry, proceed with the application of the finishing varnish.
3. Precautions
3.1 Read the construction instructions carefully before construction.
3.2 Construction is prohibited when the temperature is below 5ºC, wind force is above grade 4, or in rainy/snowy weather; do not construct when the wall temperature exceeds 50ºC.
3.3 Store in a cool, clean, and dry place at 0-35ºC. Use the product as soon as possible after opening.
Discuss this product for your project
Include your application, required quantity and destination.
