Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Zinc Epoxy Primer for Steel Structures - Anti-Rust
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
| Product Description |
Product Name:Premium Zinc Epoxy Primer for Steel Structures - Anti-Rust
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
The substrate temperature must be 3°C higher than the dew point, relative humidity <85%, wind force ≤ level 3; when the substrate temperature is lower than 5°C, the epoxy resin and curing agent stop reacting and construction should be stopped. Avoid rainy, foggy, windy and sandy days and condensation in the morning and evening for outdoor construction.
4.Notes:
1. Before use, use mechanical stirring to mix component A evenly, and then mix it evenly with component B.
2. Regularly stir during the coating process to prevent sedimentation, which can cause an imbalance in the powder to liquid ratio and affect the quality of the paint film.
3. It is recommended that the dry film thickness be ≥70μm, and 1 to 2 coats be completed.
4. After mixing, the two-component paint is generally used up within 5 hours. Exceeding the time may affect the coating quality.
5. After the curing agent is used up, it must be covered tightly and used up as soon as possible to prevent losses caused by reactions with water vapor in the air.
| Company Profire |

| Construction Process |
The construction process of anti-corrosion coatings typically includes key stages such as pre-construction preparation, surface treatment, coating application, and quality inspection. Below are the detailed steps:
1. Pre-Construction Preparation
-
Material Preparation:
-
Check the shelf life and properly mix primers, intermediate coats, topcoats, and hardeners as per ratios.
-
Tool Preparation:
-
Prepare spraying equipment (e.g., air compressor, spray gun), brushing tools, sandpaper, grinders, masks, and gloves.
-
-
Substrate Inspection:
-
Ensure the base (metal/concrete) is flat, free of cracks, oil, or rust; repair if necessary.
-
-
Environmental Requirements:
-
Temperature: 5°C-35°C; humidity ≤85%.
-
Avoid rain, strong wind, or dusty conditions.
2. Surface Treatment
Metal Surface Treatment
-
Rust Removal:
-
Use sandblasting, shot blasting, or manual grinding to remove rust/oxidation, achieving Sa2.5 (uniform roughness) or St3 (no visible rust).
-
-
Degreasing:
-
Wipe with solvents to remove oil and dust.
-
-
Concrete Surface Treatment
-
Grinding:
-
Remove loose particles and smooth the surface; fill cracks with putty.
-
-
Drying:
-
Ensure moisture content ≤8% to prevent blistering.
3. Coating Application
-
Primer Application:
-
Apply evenly via brushing/spraying (50-80μm thickness).
-
Allow drying per manufacturer's instructions (typically >24 hours).
-
-
Intermediate Coat:
-
Apply after primer curing (e.g., fiberglass-reinforced coat) for thickness/impermeability.
-
Sand smooth post-drying.
-
-
Topcoat Application:
-
Apply 2-3 layers for weather/chemical resistance.
-
Total thickness: 200-300μm (industrial use); inspect for bubbles/voids between layers.
4. Quality Inspection & Acceptance
-
Visual Check:
-
Coating must be smooth, free of sagging, cracks, or pinholes; color uniformity required.
-
-
Thickness Test:
-
Use a thickness gauge (3+ random checks per ten squre meter; ≥90% compliance).
-
-
Adhesion Test:
-
Cross-cut test: No peeling = pass.
-
-
Spark Test:
-
Use a holiday detector to locate coating defects; repair if leaks found.
-
-
-
-
| Packaging & Shipping |
| Our Projects |

| Our Exhibition |

| FQA |
Q1.Are You Factory Or Trading Company?
A:We are Manufacturer
Q2.How about the price ?
A:We can offer the best wholesale price which depend on the quantity of the order.
Q3.I need to make sure the quality and the color .
A:Our pleasure!We can offer the liquid Free sample for you to test and color chart.
Q4.If the product is not ideal, what can we do?
A:We have perfect after-sales service to help to complete the construction smoothly.
Even if there are any unexpected things in your order, we will assist to solve them.
Q5.What's your MOQ (min order quantity),production period and delivery time?
A:Our MOQ is 100Kg. We accept mixed order and the production period and delivery time are 7-10 days.
Q6.Can I have my logo on the package?
A:Of course! Customized logo, customized packaging and graphic customization are available.
Q7.Can you provide the samples?
A:Yes, we can offer you this sample for free, but the shipment charge usually paid by your
side, please advise your express account and address in details. Thanks
Discuss this product for your project
Include your application, required quantity and destination.
